Innovative Bridge Technologies/Accelerated Bridge Construction

University Transportation Center

Menu

Skip to content
  • Home
    • About Us
    • Center Partners
    • Center Administration
    • Key Researchers
    • Advisory Committee
    • Students
    • Mentors
    • Project & Research Databases
    • ABC-UTC Reports & Publications
  • Research
    • IBT/ABC-UTC Internship Opportunities
    • Research Facilities
    • FIU Research Projects
    • UNR Research Projects
    • OU Research Projects
    • UW Research Projects
    • UGA Research Projects
    • TAMU Research Projects
    • FAMU Research Projects
    • ISU Research Projects
    • Progress Reporting System
  • Education
    • Professors’ Workshop Series
    • Professors’ Workshop Series Archives
    • Graduate Student Spotlight
    • K-12 Resources
    • College Resources
    • Continuing Education Courses
    • Activities / Outreach
    • Campaign Panther X: Shaping Panther Minds, Shaping Industries
  • Webinars
    • Monthly Webinar
    • Monthly Webinar Archives
    • Symposium
    • Symposium Archives
    • In-Depth Web Training
    • In-Depth Web Training Archives
    • Research Seminar
    • Research Seminar Archives
    • Research Day
    • Research Day Archives
  • Resources
    • Project & Research Databases
    • ABC Guides
    • Contractor Workshop
    • State DOTs
    • Implemented Advanced Technologies
    • Industry
    • FHWA
    • SHRP2 Implementation
    • TRB ABC Joint Subcommittee
  • 2026 World Bridge Engineering Conference
    • Abstract Submission
    • Program
    • Call for Awards
    • Paper and Presentation Submission
    • Keynote Speakers
    • Registration
    • Housing
    • Sponsors
    • Exhibitors
    • Travel Scholarships
    • Conference Archives
    • Q and A
    • Contact Us
  • News
  • Events

Just in time for Memorial Day weekend; Bridge replacement on Ross Clark Circle complete

Just in time for Memorial Day weekend; Bridge replacement on Ross Clark Circle complete

DOTHAN, Ala. – The Alabama Department of Transportation (ALDOT) has announced the completion of major construction activities, on the Beaver Creek Bridge at Ross Clark Circle between Bauman Drive and Fortner Street, which began on February 9, 2015.

Upcoming Events

  • July 23, 2026

    Structural Design with Ultra-High Performance Concrete (UHPC)

  • July 31, 2026

    Using Dog and Magnetic Field to Accurately Detect Corrosion in Steel Strands Embedded in Concrete

  • August 27, 2026

    Advancing Caltrans Bridge and Structures Project Delivery with BIM4I

  • September 8, 2026

    Accelerated and Innovative Bridge Deck Repair

Contact Us

Phone: (305) 348-0110
Email: abc@fiu.edu
10555 W. Flagler Street,
EC 3680
Miami, FL 33174

Connect With Us

Feedback

  • Click Here to Give Feedback
  • Add Name to ABC-UTC Email List

Resources

  • Nondiscrimination
  • Title IX
  • Report Discrimination or Harassment
FIU Logo
FIU Innovative Bridge Technologies/Accelerated Bridge Construction © 2016 | Theme Designed and Developed by EWS - Division of Information Technology