September 13, 2012 1:00 pm
by William Nickas P.E., Managing Director of Transportation Systems, Prestressed Concrete Institute.
Webinar Documents
- ABC Short-Span Low-Volume Bridge Types & Lessons Learned – Part 3: Concrete - PDF of Presentation
- News, September - 13 - 2012 - pdf of presentation
Across the country, the use of accelerated bridge construction (ABC) has proven beneficial for bridge types that range from short to long span, while maintaining traffic flows that range from low to high volume. These projects have provided many lessons learned. This presentation is the first in a series of three industry presentations on lessons learned from accelerated short-span low-volume bridge construction. It discusses solutions that can meet the need to replace single and multi-span bridges with total bridge lengths in the 20 ft to 140 ft range, and to replace these bridges in a prefabricated and accelerated manner. It describes details on various steel ABC projects and focuses on ways to further improve the accelerated construction of steel bridges.