May 19, 2016 1:00 pm
by Dina Miron, P.E., Head, Structural Section, Ministry of Transportation, Ontario, Eastern Region; and Michel Vachon, P.E., Manager, Bridge Engineering, Ottawa, Ontario MMM Group Limited, a WSP Company
Webinar Documents
- Overview of Ontario's Rapid Installation of Single-Span Bridges - pdf of presentation
- Technical Details on Ontario's Rapid Installation of Single-Span Bridges - pdf of presentation
- News - May 29, 2016 - pdf of presentation
Description: For almost a decade the Ministry of Transportation of Ontario (MTO) has been accelerating the replacement of its substandard bridges in weekend closures with self-propelled modular transporters (SPMTs). Using SPMTs the MTO has replaced 13 single-span bridges, three multi-span bridges including a curved structure, and two concrete rigid frame bridges. This presentation describes the replacement of single-span slab-on-steel girder bridges with semi-integral abutment conversions, including lessons learned. The most recent, completed in 2015, were the Kent Street Overpass EBL and WBL structures on Highway 417 in Ottawa, which feature curved abutments and variable-depth girders with span lengths ranging from 19 to 32 meters in length. Five other single-span twin bridges were replaced between 2007 and 2013, also on Highway 417 in Ottawa, and one single-span bridge was replaced in Toronto.
Kent Street Overpass EBL
Ballast wall cutting for semi-integral abutment conversion
Adjustable bearing pedestal supporting Kent Street EBL structure
Temporary lateral restraining device - Kent Street Overpass
Island Park Drive Overpass