September 20, 2018 1:00 pm
Pamela Hutton, P.E., SHRP2 Implementation Manager, AASHTO; Erik R. Tobey, Estimating/Operations Manager, Tobey’s Construction & Cartage, Inc.; and Dale R. Meredith, Estimating/Project Manager, Tobey’s Construction & Cartage, Inc.
Winner of Best ABC Project Award in the Lateral Slide Technology Category (Highway Bridge) at the 2019 International ABC Conference!
Webinar Documents:
SHRP2 Overview - pdf of presentation
Contractor Perspective on ABC – SHRP2 R04 Spotlight on IL 115 Gar Creek Bridge Lateral Slide - pdf of presentation
Time-lapse video: Part 1 of 4, IL 115 Gar Creek Slide, Tobey Construction - YouTube
Time-lapse video: Part 2 of 4, IL 115 Gar Creek Slide, Tobey Construction - You Tube
Time-lapse video: Part 3 of 4, IL 115 Gar Creek Slide, Tobey Construction - YouTube
Time-lapse video: Part 4 of 4, IL 115 Gar Creek Slide, Tobey Construction - You Tube
Q&A Session - pdf
News - September 20, 2018 - pdf of presentation
Description: This is the third of three presentations hosted by the ABC-UTC in 2018 in collaboration with SHRP2, an AASHTO / FHWA / TRB partnership. This presentation highlights a contractor's perspective on an ABC Accelerated Innovation Deployment (AID) Demonstration project. The Illinois (IL) 115 Gar Creek Bridge in District 3, Kankakee County, Illinois, was replaced using the lateral slide (slide-in bridge construction) method. The existing single-span precast box beam bridge, built in 1976, was replaced with an 82-ft-long, 36-ft-wide, single-span rolled steel beam with composite deck superstructure supported on steel H-piles with precast concrete caps in the semi-integral abutments. The new bridge superstructure was constructed next to the existing bridge and then rolled into place during a 72-hour roadway closure window. The construction contractors provide their perspective on the ABC used in this project. Design and construction details and lessons learned will be discussed.
Presentation Photos/Graphics: