-
October 25, 2024
Large-scale Implementation of Semi-Proprietary UHPC with Virgin and Recycled Fibers for Full Precast Bridge Columns
-
July 26, 2024
A Comprehensive Decision Support Tool for Accelerated Bridge Construction Considering Safety, Social Equity, and Environmental Justice
-
April 26, 2024
Insights into the Pull-Off Strength of Polymer Concrete and the Effect of Nanomodification
-
January 26, 2024
Exploring Fiber-Reinforced Concrete for Accelerated Bridge Construction Applications
-
October 27, 2023
3-D Printing Using Ultra-High Performance Concrete
-
July 28, 2023
Design Guidance for UHPC Connections of Precast Girders Made Continuous for Live Load
-
April 28, 2023
Integrated Flood and Socio-Environmental Risk Analysis for Prioritizing ABC Activities
-
January 27, 2023
Robust Methods for UHPC Early-Strength Determination and Quality Control for ABC
-
October 28, 2022
Alternative Technical Concepts for Contract Delivery Methods in Accelerated Bridge Construction
-
July 29, 2022
Development of User-friendly Tools and Decision-making Algorithms for Service Life Design of ABC Bridges
-
April 29, 2022
Application of Polymer Concrete for Seismic ABC Connections
-
January 28, 2022
Critical Impacting Factors/Trends on Bridge Design, Construction, and Operation for Future Planning
-
October 29, 2021
Service Life Design Guidance for UHPC Link Slabs
-
July 30, 2021
Behavior and Strength of UHPC in Shear
-
April 30, 2021
Connections for Concrete-Filled Steel Tubes in Bridge Applications
-
January 29, 2021
More Choices for Connecting Prefabricated Bridge Deck Elements
-
October 30, 2020
ABC and Safety: Work Zone Safety Analysis, Investigating Benefits from ABC on Roadway Safety
-
July 31, 2020
Synthesis of Available Methods for Repair of Reinforced Concrete and Prestressed Concrete Girders
-
April 30, 2020
Rapid Retrofitting Techniques for Induced Earthquakes – Phase I
-
January 31, 2020
Extending Maximum Length of the Folded Steel Plate Girder Bridge System (FSPGBS), exceeding 100 ft. with Capability to Incorporate Camber
-
October 25, 2019
Performance Comparison of In-Service, Full-Depth Precast Concrete Deck Panels to Cast-in-Place Decks
-
July 26, 2019
Durable UHPC Columns with High-Strength Steel
-
April 26, 2019
Integral Abutment Details for ABC Projects, Phase II
-
January 25, 2019
An Integrated Project to Enterprise-Level Decision Making Framework for Prioritization of ABC
-
November 1, 2018
Accelerated Repair of Existing Bridges Using UHPC
-
July 27, 2018
Shake Table Studies of a Bridge System with ABC Connections
-
April 27, 2018
Alternative ABC Connections Utilizing UHPC
-
January 26, 2018
Material Design and Structural Configuration of Link Slabs for ABC Applications
-
November 2, 2017
Development and Seismic Evaluation of Pier Systems with Pocket Connections and UHPC Columns
-
August 3, 2017
Extending Application of Simple for Dead Load and Continuous for Live Load (SDCL) to High Seismic Areas
-
April 28, 2017
Development of Prefabricated Concrete Bridge Railings: Phase I Testing and Results
-
January 27, 2017
Estimating the Total Cost of Accelerated Bridge Construction
-
October 28, 2016
Emerging Alternatives for ABC in High Seismic Zones
-
July 29, 2016
ABC Techniques to Improve Durability, Sustainability, and Efficiency
-
April 29, 2016
ABC Solutions
-
January 29, 2016
Novel Bridge Column Connections for Use in ABC