Iowa DOT
[For more information, contact Steve Seivert, Methods Engineer, Bridges & Structures Bureau, Steve.Seivert@iowadot.us]
- Accelerated Bridge Construction
- Innovative Bridge Research and Construction/Deployment (IBRC/IBRD) Program
Massachusetts DOT
[For more information, contact Alex Bardow, State Bridge Engineer, alexander.bardow@state.ma.us]
Michigan DOT
[For more information, contact Rebecca Curtis, Chief Bridge Engineer, curtisr4@michigan.gov]
- Michigan DOT Bridge Design Manual. Section 7.01.19
- Research Reports:
- Videos of Bridge Construction:
- Slide-in Bridge Construction (lateral slides)
Minnesota DOT
[For more information, contact Ashley Jacobson, Ashley.Jacobson@state.mn.us]
Oregon DOT
[For more information, contact Alex Lim, Steel Bridge Standards Engineer, Alex.K.LIM@odot.oregon.gov]
- Bridge Design Manual – Section 1.16.2, Accelerated Bridge Construction (ABC) Guidelines
- Accelerated Bridge Construction (ABC) Decision Making and Economic Modeling Tool Research Final Report
- Presentation: ABC A Change in Emphasis (2018)
- History of ABC in Oregon (2011)
Texas DOT
[For more information, contact Graham Bettis, State Bridge Engineer and Bridge Division Director, graham.bettis@txdot.gov]
- ABC online standards include prestressed decked slab beams, prestressed slab beams, prestressed box beams, precast bent caps, and prestressed partial-depth deck panels
Utah DOT
[For more information, contact Cheryl Hersh Simmons, State Bridge Engineer and Chief Structural Engineer, cherylhersh@utah.gov]
“ABC is not separated anymore. It’s just part of doing business.”
2015 quote from Carmen Swanwick, Chief Structural Engineer, Utah DOT
Vermont Agency of Transportation
[For more information, contact Rob Young, Accelerated Bridge Program Manager, Rob.Young@vermont.gov]
- Accelerated Bridge Program Web Page
- Structures Video Playlist
- Planned Bridge Closures
- Home – VTrans Projects (vermont.gov)
Washington State DOT
[For more information, contact Amy Leland, State Bridge Design Engineer, LelandA@wsdot.wa.gov]
- Need for Development of Research Roadmap for Technological Advancements in Bridge Design and Construction, December 2021
WSDOT BDM CH 14- Accelerated and Innovative Bridge Construction - WSDOT 2015 ABC Workshop – April 2015 – Tumwater, WA
Wisconsin DOT
[For more information, contact Laura Shadewald, Structures Development Chief, laura.shadewald@dot.wi.gov]
- Bridge Manual Chapter 7 on Accelerated Bridge Construction (pdf)
- Videos:
- 2017 ABC Lightbulb (8 minutes)
- 2016 Local Roads GRS-IBS Bridge Replacement Project, built with help of FHWA AID grant (4 minutes)
- ABC Bridge Standards (Chapter 7: GRS, PBE – Piers)