About Us
Welcome
The ABC-UTC has assembled an experienced, knowledgeable, and engaged group of bridge academics and engineers who collectively will provide the transportation industry with the tools needed to effectively and economically utilize the principles of ABC to enhance mobility, and safety and produce safe, environmentally friendly, long-lasting bridges.
ABC History
Accelerated bridge construction implementation in the U.S. has been significantly advanced due to the leadership of state DOTs in partnership with the Transportation Research Board, the American Association of State Highway and Transportation Officials, the Federal Highway Administration, and academic and industry partners. This paper provides a history of those collaborative efforts.
Our hearts go out to those families who lost loved ones, those who were injured, and those impacted by the March 15 pedestrian bridge collapse.
Webinar
-
Partial-Depth Precast Deck Panel Design and Construction in Texas
April 19, 2018
(N/A EST)
2017 In-Depth Web Training Archives
-
Utah DOT's Accelerated Bridge Program
September 12, 2017
(11:00 am – 3:00 pm EST)
Highlights
2016 Highlights Report
The 2016 Highlights Report summarizes the ABC-UTC’s work during 2016.
