Use of High-Capacity Micropiles in ABC Projects

June 18, 2020 1:00 pm

Paul V. Liles, Jr., P.E., Former State Bridge Engineer, Georgia Department of Transportation; John R. Wolosick, P.E., Senior Advisor, Keller North America; and Tony Sak, P.E., Senior Engineer, Keller North America

Earn 1-hour Certificate of Attendance

Click to Register (opening soon!)

Announcements: This portion of the webinar will provide you with the latest happenings related to ABC in the US and abroad to keep you informed. (10 minutes)

Featured Presentation: Use of High-Capacity Micropiles in ABC Projects (35 Minutes)

Description: Micropiles are drilled and grouted steel pipe or steel bar piles. They have been in use in the U.S. since the early 1980s. The low headroom (8 feet) required for placement of micropiles allows the installation of new foundations for a replacement bridge while traffic is maintained on the existing bridge, thereby reducing the length of bridge closures for ABC projects. Micropiles are small diameter piles, typically ranging from about 4 ½ inches to less than 12 inches in diameter. They can be installed in challenging ground conditions, such as karstic limestone, boulders, urban fills and high groundwater conditions. Micropiles can also be used where challenging physical constraints such as low headroom, limited access, or vibration sensitive areas exist. Micropiles are installed to carry very high capacities of 100 to over 200 tons service load, even with such small diameters and with very small deflections. The design and construction of micropile foundations in ABC bridge projects with reduced closure requirements will be presented.

 Presentation Photos/Graphics:

1) Typical micropile installation procedure

2) Micropile segments

3) Threaded connections

4) Micropile drilling for new bridge foundations in low headroom

5) Micropiles installed to underpin existing bridge near Columbus, Georgia

Question & Answer Period: Submit your questions when you register for the webinar and also in the question box during the webinar. (15 minutes)

Certificate of Attendance: Each site registered for this webinar will receive an email for your response. Just click the first link in the email to obtain a certificate. For multiple participants at a site, the point-of-contact registrant for that site also clicks the second link in the email, logs in, and clicks “Attendees” to provide first name, last name, and email address for each participant at that site; each participant will then receive an automatic email with link to print an individual certificate. Accessing the second link in the email will also allow participants to print certificates for past webinars that were attended by simply clicking the webinar title. Please let Dr. David Garber at FIU know if you have questions or need assistance with receiving your certificate. David’s email address is dgarber@fiu.edu.

For More Information: Please visit our website (abc-utc.fiu.edu) for more information. You can also contact us by sending an email to abc@fiu.edu.