Innovative Bridge Technologies/Accelerated Bridge Construction

University Transportation Center

Menu

Skip to content
  • Home
    • About Us
    • Center Partners
    • Center Administration
    • Key Researchers
    • Advisory Committee
    • Students
    • Mentors
    • Project & Research Databases
    • ABC-UTC Reports & Publications
  • Research
    • IBT/ABC-UTC Internship Opportunities
    • Research Facilities
    • FIU Research Projects
    • UNR Research Projects
    • OU Research Projects
    • UW Research Projects
    • UGA Research Projects
    • TAMU Research Projects
    • FAMU Research Projects
    • ISU Research Projects
    • Progress Reporting System
  • Education
    • Professors’ Workshop Series
    • Professors’ Workshop Series Archives
    • Graduate Student Spotlight
    • K-12 Resources
    • College Resources
    • Continuing Education Courses
    • Activities / Outreach
    • Campaign Panther X: Shaping Panther Minds, Shaping Industries
  • Webinars
    • Monthly Webinar
    • Monthly Webinar Archives
    • Symposium
    • Symposium Archives
    • In-Depth Web Training
    • In-Depth Web Training Archives
    • Research Seminar
    • Research Seminar Archives
    • Research Day
    • Research Day Archives
  • Resources
    • Project & Research Databases
    • ABC Guides
    • Contractor Workshop
    • State DOTs
    • Implemented Advanced Technologies
    • Industry
    • FHWA
    • SHRP2 Implementation
    • TRB ABC Joint Subcommittee
  • 2026 World Bridge Engineering Conference
    • Abstract Submission
    • Program
    • Call for Awards
    • Paper and Presentation Submission
    • Keynote Speakers
    • Registration
    • Housing
    • Sponsors
    • Exhibitors
    • Travel Scholarships
    • Conference Archives
    • Q and A
    • Contact Us
  • News
  • Events

Michael Baker International Assisting Arkansas DOT with State’s First Accelerated Bridge Construction Lateral Slide Replacement Project

Michael Baker International Assisting Arkansas DOT with State’s First Accelerated Bridge Construction Lateral Slide Replacement Project

Design Replaces Two I-30 Bridges Using ABC Technique Known as Lateral Slide Bridge Replacement … Construction is expected to begin in Spring 2019.

Upcoming Events

  • October 15, 2026

    Georgia DOT's Accelerated Bridge Construction Policy - Success Story

  • October 30, 2026

    Repair and Upgrade of Steel Culverts Using Sprayable Ultra-High-Performance Concrete (UHPC)

  • November 19, 2026

    From Paper to Pixels to Concrete: East 138th Street Bridge Replacement and the Evolution of Digital Delivery at NYSDOT

  • September 7, 2027

    2027 Annual In-Depth Web Training - Topic TBD

Contact Us

Phone: (305) 348-0110
Email: abc@fiu.edu
10555 W. Flagler Street,
EC 3680
Miami, FL 33174

Connect With Us

Feedback

  • Click Here to Give Feedback
  • Add Name to ABC-UTC Email List

Resources

  • Nondiscrimination
  • Title IX
  • Report Discrimination or Harassment
FIU Logo
FIU Innovative Bridge Technologies/Accelerated Bridge Construction © 2018 | Theme Designed and Developed by EWS - Division of Information Technology