My Calendar

Events in September 2023

  • 2023 Western Bridge Engineers' Seminar - Phoenix, AZ

    Category: Events - Important (on right) 2023 Western Bridge Engineers' Seminar - Phoenix, AZ

    N/A
    September 5, 2023 September 8, 2023

  • 2023 Western Bridge Engineers' Seminar - Phoenix, AZ

    Category: Events - Important (on right) 2023 Western Bridge Engineers' Seminar - Phoenix, AZ

    N/A
    September 5, 2023 September 8, 2023

  • 2023 Western Bridge Engineers' Seminar - Phoenix, AZ

    Category: Events - Important (on right) 2023 Western Bridge Engineers' Seminar - Phoenix, AZ

    N/A
    September 5, 2023 September 8, 2023

  • 2023 Western Bridge Engineers' Seminar - Phoenix, AZ

    Category: Events - Important (on right) 2023 Western Bridge Engineers' Seminar - Phoenix, AZ

    N/A
    September 5, 2023 September 8, 2023

  • Precast Substructures

    Category: In Depth Web Training Precast Substructures


    September 12, 2023

    by Michael S. Arens, S.E., P.E., Vice President, Michael Baker International; Michael P. Culmo, P.E., Chief Bridge Engineer, CHA Consulting, Inc.; Peter Graf, P.E., S.E., Executive Vice President, Infrastructure Consulting & Engineering, PLLC; Bijan Khaleghi, Ph.D., P.E., S.E., Principal Structural Engineer, TranTech Engineering; Associate Research Professor and Director of Implementation, ABC-UTC at Florida International University; Amy Leland, P.E., S.E., State Bridge Design Engineer, Bridge & Structures Office, Washington State DOT; Khashayar Nikzad, Ph.D., P.E., Principal Engineer, TranTech Engineering; and Christopher D. White, P.E., Senior Technical Advisor – Structures, Volkert, Inc. – Houston, TX; with Q&A panel members G. J. Schexnayder, P.E., Group Manager – Heavy Construction, Boh Bros. Construction Co., LLC; and Hossein Ghara, P.E., Senior Bridge Design Manager, Volkert, Inc. - Baton Rouge, LA

    The ABC-UTC 2023 In-Depth Web Training features the latest developments related to precast substructures, and examples of their use. This training is four hours in length and consists of six modules, each a 30-minute presentation followed by a 10-minute Q&A session, with a 15-minute break between Module 3 and Module 4. It starts at 11:00 a.m. Eastern and ends at 3:15 p.m. Eastern.

    Description: Prefabricated bridge elements such as precast substructures can provide significant onsite speed for bridge replacement and rehabilitation projects. Precast substructure elements such as pier caps, pier columns, footings, and abutments can be constructed near site or offsite in precast concrete fabrication plants and hauled to the site for immediate erection. The prefabrication can be done prior to bridge closure and concurrent with foundation construction. Although still underutilized, precast substructures are becoming more common as their advantages become better known. This year’s training describes available specifications and design basics, example completed projects, and ABC-UTC research outputs ready for implementation to further improve this important prefabricated bridge element.

    Note: Various types of prefabricated substructure elements are listed in the "Keywords for Database Search" for the ABC Project Database.

    Presenters

     

    Michael S. Arens, S.E., P.E.
    Vice President
    Michael Baker International
    Phone: 801-352-5981
    Email: marens@mbakerintl.com

    Mike is a Vice President with Michael Baker International in the Salt Lake City, Utah office. He has been with the firm since 2004. Mike has extensive experience in Accelerated Bridge Construction. He has led the design of multiple ABC projects including the first bridge moved into place using Self Propelled Modular Transporters in the western U.S., Utah’s first transverse bridge slides, and a Single Point Urban Interchange bridge launch over I-15. Mike has worked with multiple DOTs over the years helping to implement new ABC initiatives and projects. He is a graduate of the South Dakota School of Mines & Technology.

     

    Michael P. Culmo, P.E.
    Chief Bridge Engineer
    CHA Consulting, Inc.
    Phone: 860-206-1279
    Email: mculmo@chacompanies.com

    Mike is a Bridge Engineer with 39 years of experience in bridge and highway design. He has extensive experience in the design of steel, concrete, and prestressed/precast concrete bridges, and has been responsible for managing design teams on new expressway bridges, highway interchanges, and bridge rehabilitation projects. Mike is the author of numerous national publications and manuals on bridges and was the principal author of the 2018 AASHTO LRFD Guide Specifications for Accelerated Bridge Construction. He holds a bachelor’s degree in Civil Engineering and a master’s degree in Structural Engineering, both from the University of Connecticut.

     

    Peter Graf, P.E., S.E.
    Executive Vice President
    Infrastructure Consulting & Engineering, PLLC
    Phone: 919-812-7776
    Email:
    peter.graf@ice-eng.com

    Peter is the Executive Vice President and Technical Director for Infrastructure Consulting & Engineering, a multi-disciplined transportation engineering firm specializing in alternative delivery and value engineering solutions. Over his nearly 30-year career, Peter has designed a broad range of structures including prestressed beam, steel girder, and post-tensioned segmental bridges for both highways and rail.  He has led design-build projects valued at over $2 billion located in eight different states and completed numerous value engineering enhancements for ICE’s construction partners. Peter is a proud graduate of Tulane University, a registered Professional Engineer in 14 states, and a registered Structural Engineer in IL and GA.

    Bijan Khaleghi, Ph.D., P.E., S.E.
    Principal Structural Engineer,
    TranTech Engineering;
    Associate Research Professor and Director of Implementation,
    ABC-UTC at Florida International University
    Email: Bkhaleghi@TranTecheng.com
    Bkhalegh@fiu.edu

    Bijan is the former State Bridge Design Engineer with the Washington State Department of Transportation. He was a member of AASHTO Technical Committees T-8, T-10, and T-20; and member representative of AASHTO at PIARC Road Tunnel Design and Operation. Bijan was the Chair of TRB AKB30, Standing Committee on Concrete Bridges; and member of AKB50, Seismic Design and Performance of Bridges, and AKB60, Tunnels and Underground Structures.  He is a member of PCI, ASBI, and PTI.   Bijan is recipient of the PCI Robert J. Lyman award, October 2018; PCI Fellow Award, February 2018; ASCE T.Y. Lin Award, March 2014; Charles C. Zollman Award, PCI Journal 2011 and 2013; ASCE SEI T.Y. Lin Award, May 2006; and Martin P. Korn Award, PCI Journal Award 2005.

     

    Amy Leland, P.E., S.E.
    State Bridge Design Engineer
    Bridge & Structures Office
    Washington State DOT
    Phone: 360-705-7181
    Email: LelandA@wsdot.wa.gov

    Amy received her Master of Science in Engineering degree from the University of Washington and is licensed as a Professional Engineer and a Structural Engineer. She has been working in the Washington State Department of Transportation (WSDOT) Bridge Design Office since 1999. Her bridge design experience includes structural analysis and design for reinforced concrete, prestressed concrete, post-tensioned concrete, and steel bridges. Amy was previously the Bridge Seismic and Foundation Specialist for the WSDOT Bridge Design Office. She has participated in establishing policy and overseeing research for WSDOT.

    Khashayar Nikzad, Ph.D., P.E.
    Principal Engineer
    TranTech Engineering
    Phone: 425-990-4134
    Email: knikzad@trantecheng.com

    Khashayar (Kash) has more than 28 years of experience in transportation-related structural analysis and design, and his specialty is in seismic analysis, research and retrofit recommendations. He is regularly involved in all phases of design and construction for transportation projects with bridge structures and has contributed technical papers to well-known civil engineering journals and conferences on the subject matter. Kash has also contributed as a member of PCI’s subcommittee on seismic design of bridges with precast components and to ABC-UTC webinar training in the past.

     

    Christopher D. White, P.E.
    Senior Technical Advisor – Structures
    Volkert, Inc. – Houston, TX
    Phone: 936-777-0610
    Email: chris.white@volkert.com

    Chris is a Structures Senior Technical Advisor for Volkert, Inc., in Houston, TX. He received his BS degree from the University of Illinois and an MS degree from the University of Texas. His major project resume includes: the Downtown San Antonio “Y” Project in Texas; the Sunshine Skyway Bridge and Roosevelt Bridge in Florida; the “Big Dig” Central Artery/Tunnel Project in Boston; the Kentucky Lakes Arch Bridge; the Lake Pontchartrain Safety Bay Project; and international projects for the Trans Israel Highway and Panama Metro Line 2. Chris is Chair of the PCI Committee on Bridges and serves on the ASBI Technology and Innovation Design Subcommittee and joint PTI/ASBI DC-40 Bridge Design Committee.

    Module 1: Available Precast Substructure Specifications and Resources

    by Michael P. Culmo, P.E., Chief Bridge Engineer, CHA Consulting, Inc.

    Description: This module focuses on the three major components required to complete a precast substructure design. These include design specifications, construction specifications, and design details. The first two items are covered in the 2018 AASHTO LRFD Guide Specifications for ABC. The third component is design detailing, which is not covered in detail in the Guide Specifications for ABC. Fortunately, the bridge industry has stepped up to develop recommended guide details for precast substructures. The module showcases precast substructure details developed by the Northeast Bridge Technical Committee of the Precast/Prestressed Concrete Institute.

    Module 1 presentation pdf
    Q&A pdf

    Figure 1-1. AASHTO LRFD Guide Specifications for Accelerated Bridge Construction, 1st, 2018

     

    Figure 1-2. PCINE Guidelines for Precast Substructures used in ABC, 1st, 2022

    Module 2: Washington State’s I-5 / US 12 Bridge at Grand Mound Precast Substructure  

    by Amy Leland, P.E., S.E., State Bridge Design Engineer, Bridge & Structures Office, Washington State Department of Transportation; Bijan Khaleghi, Ph.D., P.E., S.E., Principal Structural Engineer, TranTech Engineering, and Associate Research Professor and Director of Implementation, ABC-UTC; and Khashayar Nikzad, Ph.D., P.E., Principal Engineer, TranTech Engineering

    Description: The I-5 / US 12 Bridge at Grand Mound south of Olympia is the Washington State Department of Transportation’s first bridge replacement project to have precast prestressed concrete caps and columns and an all-precast superstructure with seismically-resistant connections. This module focuses on the precast substructure with its cap-to-column grouted duct connections, column-to-column segment grouted duct connections, and column-to-footing socket connections, constructed in 2011. Design and construction details, lessons learned, and performance to date are discussed.

    Module 2 presentation pdf
    Q&A pdf

    Figure 2-1. Placement of precast column bottom segment with socket connection to footing

    Figure 2-2. Erection of precast prestressed caps with grouted duct connections to precast columns

    Module 3: Louisiana's Precast Erection for Lake Pontchartrain Bridge Safety Bay Substructure

    by Christopher D. White, P.E., Senior Technical Advisor – Structures, Volkert, Inc. – Houston, TX; with Q&A panel members G. J. Schexnayder, P.E., Group Manager – Heavy Construction, Boh Bros. Construction Co., LLC; and Hossein Ghara, P.E., Senior Bridge Design Manager, Volkert, Inc. - Baton Rouge, LA

    Description: Using ABC methods, a $60-million project to install safety bays on America’s longest bridge, the Lake Pontchartrain Causeway in Louisiana, was completed in June 2020. The project introduced six 1008-ft-long x 16-ft-wide safety (pullover) bays at six locations along each of the northbound and southbound structures. The improvements were the product of owner, designer, and contractor collaboration under a Construction-Manager-At-Risk (CMAR) contract. With two lanes of traffic in each direction, no shoulders and over 40,000 vehicles per day, lane closures during construction were not feasible and it was necessary to minimize the duration of construction. Therefore, an all-precast solution was developed – cylinder piles, pile caps and composite girder/slab deck units complete with barrier rails – with only cap-to-existing-cap and cap-to-pile connections being cast-in-place. This module focuses on the precast piles and bent caps, which were erected using barge-mounted equipment to eliminate operations on the deck immediately adjacent to traffic.

    Module 3 presentation pdf
    - Q&A pdf

    Figure 3-1. A precast cap with cylinder pile plug cage being hoisted for erection; cast-in-place closure joint steel is visible along the cap near end

    Figure 3-2. Once all caps were placed and shimmed to proper elevation within a given bay, the pile plugs were cast using tremie placement through a void in the top of the cap

    Module 4: Alabama’s I-59/20 Birmingham Central Business District Precast Substructure

    by Peter Graf, P.E., S.E., Executive Vice President, Infrastructure Consulting & Engineering, PLLC

    Description: The Alabama Department of Transportation needed to replace the aging I-59/20 viaduct through downtown Birmingham with a new 6,000-foot-long structure. The project specifications allowed for a 14-month complete closure of I-59/20 for demo and replacement of the structures. The closure period was enforced with $250,000 per day liquidated damages, but also early completion incentives up to a maximum of $15M. After award of the project to Johnson Bros. / Oscar Renda Joint Venture, Infrastructure Consulting & Engineering, PLLC (ICE) was engaged to re-design the substructure of the bridges from cast-in-place to precast, allowing for the off-site production of the precast elements prior to demo of the existing bridge and rapid erection of the pier columns during the closure period. This ABC method allowed for reduction of the interstate closure period from the allowable 14 months to less than 12 months, opening to traffic in January 2020 and earning the maximum incentive bonus for the construction team. This module focuses on the precast substructure design and construction details and lessons learned.

    Module 4 presentation pdf
    Q&A pdf

    Figure 4-1. Precast pier cap lifted from the form in the casting yard

    Figure 4-2. Precast pier cap being erected on the hollow column section

    Module 5: Utah’s Riverdale Road over I-84 Precast Substructure and Its Performance

    by Michael S. Arens, S.E., P.E., Vice President, Michael Baker International; and Michael P. Culmo, P.E., Chief Bridge Engineer, CHA Consulting, Inc.

    Description: In 2008, the Riverdale Road / I-84 Single Point Urban Interchange (SPUI) bridge used multiple Accelerated Bridge Construction (ABC) techniques to minimize the impacts to the traveling public during the bridge reconstruction. In addition to saving construction time, these techniques included innovative design and detailing to reduce construction costs and improve construction quality. This module focuses on the precast substructure design and construction details and lessons learned. In addition, the Utah DOT has undertaken a series of inspections of bridges built with ABC methods. The goal is to verify the performance of the bridges over time to ensure that the ABC designs will be durable and long-lasting. The Riverdale Road Bridge has been inspected six times since 2009. The current performance of the bridge, in particular the substructure, is discussed 15 years into service based on the most recent 2023 inspection of this bridge.

    Module 5 presentation pdf
    Q&A pdf

    Figure 5-1. Abutment precast section with post-tensioning rods during construction

     

     

    Figure 5-2. Precast bent cap prior to erection

    Figure 5-3. Inspection photo of precast pier bent in 2023

    Figure 5-4. Inspection photo of distressed approach slab joint in 2019, repaired prior to 2023 inspection

    Module 6: ABC-UTC Research Outputs Ready for Implementation – Precast Substructures

    by Bijan Khaleghi, Ph.D., P.E., S.E., Principal Structural Engineer, TranTech Engineering, and Associate Research Professor and Director of Implementation, ABC-UTC

    Description: This module features ABC-UTC research outputs ready for implementation, with a particular emphasis on precast substructures. The research outputs presented in this module include bridge bent systems with UHPC shell bents and UHPC columns for ABC applications, use of UHPC shells for strengthening bridge columns and deep foundations, innovative connections for permanently cased piles to pier, seismic-resisting connections for concrete-filled tube components, performance evaluation and development of design guidelines for bridge columns with couplers in seismic applications, and design guidelines and constructability of bridge pier systems with UHPC column connections. Also included are integral bridge abutment applications in ABC projects with grouted couplers and innovative connection details. The use of innovative designs, detailing, and materials in bridge bent systems is discussed.

    Module 6 presentation pdf
    Q&A pdf

    Figure 6-1. UHPC-shell strengthened concrete column for seismic applications

    Figure 6-2. Precast integral abutment connection to piles

  • PTI Certification Training: Level 1 & Level 2 Multistrand & Grouted PT Specialist - Scottsdale, AZ

    Category: Events - Important (on right) PTI Certification Training: Level 1 & Level 2 Multistrand & Grouted PT Specialist - Scottsdale, AZ

    N/A
    September 13, 2023 September 15, 2023

    {title}

  • PTI Certification Training: Level 1 & Level 2 Multistrand & Grouted PT Specialist - Scottsdale, AZ

    Category: Events - Important (on right) PTI Certification Training: Level 1 & Level 2 Multistrand & Grouted PT Specialist - Scottsdale, AZ

    N/A
    September 13, 2023 September 15, 2023

    {title}

  • PTI Certification Training: Level 1 & Level 2 Multistrand & Grouted PT Specialist - Scottsdale, AZ

    Category: Events - Important (on right) PTI Certification Training: Level 1 & Level 2 Multistrand & Grouted PT Specialist - Scottsdale, AZ

    N/A
    September 13, 2023 September 15, 2023

    {title}

  • Five Million Pound Utah Bridge Slide

    Category: Events - General Five Million Pound Utah Bridge Slide


    September 21, 2023

    Cheryl Hersh Simmons, S.E., Chief Structural Engineer, Utah Department of Transportation; Logan Julander, P.E., Structures Manager, Michael Baker International; and Jim Deschenes, S.E., Director of Alternative Delivery, Ralph L. Wadsworth Construction

    Webinar Documents:
    Five Million Pound Utah Bridge Slide - pdf of presentation
    Time Lapse Construction Video (courtesy of Ralph L. Wadsworth Construction)
    UDOT ABC Decision Making Tool - website link (Note: Click "ABC Rating Procedure Spreadsheet and Decision Flow Chart (0.12 MB)" to download the Excel file.)
    Q&A Session - pdf
    News - September 21, 2022 - pdf of presentation

    Description: The Utah Department of Transportation replaced several bridges as part of the I-80 & I-215 Renewed design-build project on the East side of Salt Lake City that began construction in 2021 and is finishing up this year. The project used lateral slides to replace two bridges, a temporary bridge to facilitate phased replacement of two other bridges, and also includes a bridge widening. This presentation focuses on interesting aspects of one of the bridge slide replacements: 1300 East over I-80. The new 173-foot-long and 125-foot-wide single-span bridge replaced a four-span structure originally constructed in the 1960s. A weekend closure provided time for the slide to take place. This presentation gives an overview of the planning, design, and construction techniques developed from several previous slides to carry out the installation of this large structure within a limited time-frame.

    Presenters:

     

    Cheryl Hersh Simmons, S.E.
    Chief Structural Engineer
    Utah Department of Transportation
    Email: cherylhersh@utah.gov

    Cheryl is the Utah State Bridge Engineer and Chair of the AASHTO Technical Committee for Construction under the Committee on Bridges and Structures. She is also a member of the ABC-UTC Advisory Committee. Prior to joining UDOT in 2013, she spent over 23 years in the private sector focusing on project delivery and construction as a designer, resident engineer, project manager, and design quality manager on a number of fast-track design-build projects. Cheryl is a native of Maryland and earned her B.S. in Civil Engineering from Duke University and her M.S. in Structural Engineering from University of Virginia.

     

    Logan Julander, P.E.
    Structures Manager
    Michael Baker International
    Email: ljulander@mbakerintl.com

    Logan has 14 years of structures design and management experience in heavy highway and transportation projects. He is a graduate of Utah State University with a B.S. and M.S. in Structural Engineering. Since graduating Logan has spent his career working at Michael Baker International where he has been involved in multiple ABC projects, writing the ABC chapter for the Wisconsin DOT Bridge Manual, and in developing the Slide-in Bridge Construction Implementation Guide for FHWA.

     

    Jim Deschenes, S.E.
    Director of Alternative Delivery
    Ralph L. Wadsworth Construction
    Email: jdeschenes@wadsco.com

     

    Jim has a B.S. in Civil Engineering degree from the University of New Hampshire and a Master’s Degree from the University of Missouri-Rolla, now Missouri S&T. He started his career at FHWA before spending 20 years in the consulting engineering business, primarily focused on design-build delivery projects. Jim has spent the last 10 years at Ralph L. Wadsworth Construction, as the Director of Alternative Delivery. He has experience on a number of bridge slides and self-propelled modular transporter (SPMT) bridge moves.

    Presentation Photos/Graphics:

    1) Day aerial view prior to slide

    2) Leading edge guide

    3) Slide pads with shoe

    4) Night aerial view during slide

  • ASBI Monthly Webinar: Rethinking Segmental Bridges: External Tendons Only?

    Category: Events - Important (on right) ASBI Monthly Webinar: Rethinking Segmental Bridges: External Tendons Only?


    September 27, 2023

    {title}

  • NSBA 2024 Prize Design Award Competition - Submission Deadline

    Category: Events - Important (on right) NSBA 2024 Prize Design Award Competition - Submission Deadline

    N/A
    September 30, 2023